Home / Services / Schematic Design
Services

Schematic Design

With goals and accurate site data in hand, we translate requirements into a first design direction.

02Phase 02 of 7

Schematic design is where a project takes shape. We begin with a requirements meeting to define goals, budget, and constraints, then collect accurate GPS base data and develop the typical layouts that establish spacing, coverage, and overall design intent.

It is the phase that gets everyone aligned — owner, superintendent, and architect — before detailed engineering begins.

What this phase delivers

  • Requirements meeting to set goals, budget, and expectations
  • Water source & power assessment for pumping and supply
  • GPS site base data collected in the field
  • Typical schematics establishing head layout and coverage

Deliverables

  • Requirements meeting — water source, power, and road-crossing decisions
  • Sub-meter GPS site base data (clearing limits & general elevation)
  • Typical sprinkler placement & coverage plan
  • Preliminary water & power strategy

How we approach it

We collect GPS base data ourselves so the design is grounded in the real geometry of the course, not an approximation. Typical schematics then set the spacing and coverage standards the detailed design will follow.

By the end of schematic design, the design direction, water strategy, and coverage approach are settled and documented.

Who this is for

New-course builds and full renovations entering the design stage — often working alongside the golf course architect.

Get Started

Planning a new course, a renovation, or an audit?

Tell us about your project and we'll outline the right phases, scope, and approach for your course.

Request a Proposal