Home / Process
How We Work

From first call to fully operational.

Every LRDG project follows the same disciplined arc — five stages that carry a course from discovery through a fully optimized, documented irrigation system.

The Journey

Five stages, start to finish.

1

Discovery

Site visit, goals, and expectations defined with the course team.

2

Design

Schematic and developed design with hydraulic modeling.

3

Development

Construction documents, specifications, and bid packages.

4

Construction

Field staking and on-site observation through installation.

5

Closeout

Punch list, record drawings, and central system optimization.

What Each Stage Covers

Mapped to the seven phases.

The five stages above group the seven detailed phases of our service process.

STAGE 1

Discovery

Requirements meeting, water & power assessment, GPS site base data.

STAGE 2

Design

Schematic Design and Design Development — coverage, hydraulics, water-use projections, and cost.

STAGE 3

Development

Construction Documents and Procurement — a complete, biddable set and the right installer.

STAGE 4

Construction

GPS field staking, as-staked CAD drawings, and construction observation.

STAGE 5

Closeout

Walk-through, CAD record drawings, and central control database setup.

See the seven phases in detail
Grow-in sprinkler running on lay-flat pipe down a fairway
Grow-In

From first charge to full, even coverage.

Get Started

Planning a new course, a renovation, or an audit?

Tell us about your project and we'll outline the right phases, scope, and approach for your course.

Request a Proposal