Walk-through, punch list, CAD-built record drawings, and central control system database setup.
Walk-through, punch list, CAD-built record drawings, and central control system database setup.
GPS staking of every component, as-staked CAD drawings, and on-site construction observation visits.
Contractor prequalification, pre-bid meetings, bid evaluation, and pre-construction coordination.
Complete construction drawings, technical specifications, electrical schematics, and full bid documentation
Hydraulic network modeling, water-requirement projections, and a preliminary AutoCAD design with cost estimates.
Project requirements, water and power sourcing, GPS site base data, and typical sprinkler placement plans.
Equipment inventory, site-plan reconstruction, and a formal report on the condition and lifecycle of an existing system.