Final Closeout & Record Drawings

Walk-through, punch list, CAD-built record drawings, and central control system database setup.

Field Staking & Observation

GPS staking of every component, as-staked CAD drawings, and on-site construction observation visits.

Construction Procurement

Contractor prequalification, pre-bid meetings, bid evaluation, and pre-construction coordination.

Construction Documents

Complete construction drawings, technical specifications, electrical schematics, and full bid documentation

Design Development

Hydraulic network modeling, water-requirement projections, and a preliminary AutoCAD design with cost estimates.

Schematic Design

Project requirements, water and power sourcing, GPS site base data, and typical sprinkler placement plans.

Irrigation Audit & System Analysis

Equipment inventory, site-plan reconstruction, and a formal report on the condition and lifecycle of an existing system.